Construction Objects

 

Currently, the Moscow underground is being built using revolutionary engineering solutions, construction technologies and materials. In particular, cement and concrete are far from the bottom of the list. Their quality affects structural durability and passenger safety.


The materials of EUROCEMENT group Holding were used in the construction of new Moscow underground stations such as Maryina Roshcha, Slavyansky Bulvar, Park Pobedy.

By 2020, 150 km of new underground lines and 70 stations will be built in Moscow. By 2020, the total length of underground lines will increase to 451.2 km; the number of stations, to 252.